Cooling Tower Belting Replacement Works in Johor
5
AHU Filter Supply and Change in Johor
9
Changing FCU motor at Amari Hotel
6
Chilled Water Pipe Installation and Insulation Works at Holiday Villa Johor
15
Cooling Tower Maintenance and Washing Works (Multiple Sites)
13
Detail Steam and Chemical Cleaning of AHU at 5 Star Hotel
5
Experience airflow improvements with KCK Steam and Chemical cleaning for AHU and FCU, real life reports shared.
3
Forest City Golf Club Servicing of VRF Units
7
Heat Recovery / Heat Pump Retrofit and Maintenance Works - Singapore
6
HVAC Maintenance at Manufacturing Facility in Johor
16
HVAC Retrofit Works at 5 Star Hotel (Le Meridien & DoubleTree Hilton)
10
HVAC Servicing - Hotel and Office Buildings Across Johor and KL
11
HVAC Servicing and Retrofit - Industrial Site in Tuas Singapore
15
Late night Fan Coil Unit Steam Cleaning and Preventive Maintenance at Doubletree Hilton Hotel
5
Preventive Chiller Servicing by KCK Team
6
Ramada Hotel Chemical Cleaning for DX Units
7
Rectifying water leak and reinstall chilled water works and insulation at DoubleTree Hotel
9
Refrigerant leak test and refill of refrigerant
19
Residential Airconditioning Maintenance and Installation Works
1
Sample KCK-SS FCU Service Report for a Free Steam Mock up for our new Client's
14
Servicing Split Units at Paragon@CIQ
11
Servicing Water Cooled Package Units today at BMW JB
5
Steam and Chemical Cleaning Works at Multiple Locations
7
Troubleshooting motorised valve at DoubleTree today
4
VRV Installation at Dyson Site Tuas