AHU - Replacement of Cooling Coil (Johor and Selangor)

Scope of Work:

  • Site Inspection & Assessment
    Conduct detailed inspection of the existing AHU and cooling coil to assess condition, sizing, and replacement requirements.

  • System Shutdown & Safety Lockout
    Safely isolate and shut down the AHU system, following proper Lockout/Tagout (LOTO) procedures to ensure safety during works.

  • Dismantling of Existing Coil
    Remove access panels and carefully disconnect chilled water or refrigerant lines, electrical connections, and supports.

  • Removal of Damaged Coil
    Extract the old or leaking coil with proper handling to avoid damage to surrounding AHU components.

  • Supply of New Cooling Coil
    Provide high-quality replacement coil, custom-fabricated to match AHU model and required specifications (rows, fins, capacity).

  • Installation of New Coil
    Position and secure the new cooling coil in the AHU housing, ensuring correct alignment and support.

  • Reconnection of Piping & Insulation
    Reconnect chilled water/refrigerant pipes with proper brazing or mechanical fittings, and apply new thermal insulation.

  • Leak & Pressure Testing
    Perform leak tests and pressure checks on piping and coil connections to ensure system integrity.

  • Flushing & Chemical Cleaning (if needed)
    Clean chilled water lines and coil internally to remove debris, scale, or contaminants.

  • System Recommissioning
    Start up the AHU system, check flow rates, temperature differential, and airflow. Calibrate controls and thermostats as needed.

  • Final Testing & Handover
    Verify performance under actual load conditions, document readings, and hand over job with test report and warranty (if applicable).